Biography: Jordan Walker grew up a traveling kid, living on both coasts and the middle of the United States (plus a year in China) with his family before attending college. While at Clark University he designed his own undergraduate major in Multi-media Design, taking course work in film, graphic design, computer music, studio art, philosophy and religious studies. After college he experienced contemporary art and culture in San Francisco and Brooklyn. In New York he received a Masters of Education through the prestigious New York City Teaching Fellows. In 2005 he attended Foundation Studies in Anthroposophy and Waldorf Teacher Training at Sunbridge College in Spring Valley, NY. Jordan currently lives and works in Spring Valley where he is the Projector Coordinator for the Threefold Educational Center. He is a core group member of the peer-led training in social threefolding, Think OutWord, and in 2008 received a Credere social art community grant for The New Forms Project, a year long social sculpture exploring the intersection between an embodied life and sacred, aesthetic technology. Traveling is still an important part of his life and studies. He has spent time in Costa Rica, Kenya, New Zealand, Fiji, throughout Europe and North America and most recently the Philippines. Education: Waldorf Teacher Education - Sunbridge College, Spring Valley, NY May 2007 Completed Foundation year in Anthroposophy and course work for Waldorf teacher training. M.S.Ed. Elementary and Special Education - College of Staten Island, NY Aug. 2005 Dual Masters of Science awarded through the New York City Teaching Fellows Program. B.A. Multimedia Design - Clark University, Worcester, MA May 2001 Bachelor of Arts with a self-designed major in Multimedia Design and a minor in Screen Studies. Contemporary Art Courses - Birkbeck College - London, England Dec. 2000 Semester abroad with studies throughout London's museum and galleries. High School Diploma with Honors - Carlisle High School - Carlisle, PA May 1997 For online portfolio of work within education, event production and the arts please follow these links to additional resumes. Hardcopies of all resumes and further examples of work are available by request. |
